10.
|
Has damage from stream drift been considered in the falsework design?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
11.
|
Is the concrete placing sequence shown and is it consistent with the contract plans?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
B.
|
|
Foundation Requirements
|
|
|
|
|
|
|
|
|
|
|
|
|
1.
|
Are driven falsework piling provided as called for on the contract plants?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
|
a.
|
Is a minimum pile tip elevation or penetration indicated on the drawings?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
|
|
b.
|
If timber falsework piles are specified, are the recommended order lengths sufficient to virtually eliminate the possibility of pile splices?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
|
|
c.
|
Is a detailed static pile capacity analysis included in the calculations?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
|
|
d.
|
If lateral loads are applied to the piling (by equipment), dead loads, flowing water, drift), is a detailed lateral load analysis included in the calculations?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
|
|
e.
|
When piling are in an active waterway, have the potential effects of scour on axial and lateral pile support been addressed in the calculations?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
|
|
f.
|
Does the proposed falsework pile hammer meet the minimum field energy requirements as listed in 00520.20(d-2)?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
|
|
g.
|
Will a driving criteria graph [FHWA Gates Equation, in 00520.42(b)] plotting blow count versus stroke (for an acceptable pile hammer) be provided for the project inspector?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
|
2.
|
|
Is falsework supported on spread footings (mud sills)?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
|
|
a.
|
Are the spread footing elevations shown on the drawings?
|
|
____
|
____
|
____
|
|
|
|
|
|
|
|
|
|
|
b.
|
Has a rational method for determining the ultimate bearing capacity of the foundation material(s) been presented and described in the calculations?
|
|
____
|
____
|
____
|