Ana səhifə

Environmental Management Framework (emf) coastal embankment improvement project phase-i project (ceip-i) April 29, 2013 Dhaka Bangladesh Water Development Board Ministry of Water Resources Government of the People’s Republic of Bangladesh


Yüklə 7.67 Mb.
səhifə30/35
tarix25.06.2016
ölçüsü7.67 Mb.
1   ...   27   28   29   30   31   32   33   34   35

Appendix 7 Environmental Screening Format for Foreshore Afforestation


  1. Name of Polder: Year of construction:

  2. BWDB Division:

  3. District: Upazila: Union (s):






  1. Technical Information




1

Size of scheme (ha): _________




2

Type of scheme (FCD/ FCDI):______
















3

Condition of infrastructures:

3a

Embankment:

Total length: _________km

Length of embankment to be raised/ repaired:_____km

4



Species to be planted

Along the shore:



On the top :










Screening Questions

Yes

No

Scale of Impact

Remarks

High

Medium

Low

No




Is the nursery adjacent to or within any environmentally sensitive areas?






















Is there any tubewell adjacent to nursery?






















Is the tubewell used for drinking purpose?






















Will the subproject disturb the ecosystem of habitats, populations, movement or effects on rare, threatened or endangered species of flora or fauna?






















Will the implementation of the subproject involve any land acquisition and involuntary resettlement






















Is the selected plant a familiar species?






















Will the subproject cause pollution of water bodies due to disposal of agrochemical, fertilizer or other wastes






















Will the subproject cause soil infertility due to harvesting






















Will the subproject create scope for plantation of trees and laying vegetative coverage in the area?






















Will the subproject require tree felling or disruption of vegetation in the area or impair beneficial uses of traditional forest






















Will the sub-project create drainage congestion or water logging, cross-drainage problem contributing risks to natural systems






















Impact on fish migration and navigation?






















Negative effects on groundwater quality, quantity or movement?






















Blockage of navigation system?























Impediments to movements of people and animals?























Health risks to labors involved in activities?























Possible Mitigation measures (if the area is affected)






Possible Alternative Measures:

Note: Please add any other screening questions relevant to the demonstration. Also provide additional comments and/or positive impacts in ‘remarks’ column.
Recommendations:


The project is accepted for further study [ ] The project is rejected [ ]

Only IEE required [ ] Both IEE and EIA required [ ]

Other recommendations:



Screening form filled by: ____________________________ Signature:_______________ Date____
Verified by: ____________________________ Signature:________________Date_____________

1   ...   27   28   29   30   31   32   33   34   35


Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©atelim.com 2016
rəhbərliyinə müraciət