Appendix 5: List Of Polders Likely To Be Overtopped In Baseline And Climate Change Scenario


Note: ‘Overtopping depth’ means the depth of water above the present crest level of the polders.


Source: World Bank 2011

Appendix 6: Environmental Screening Format for Rehabilitation and Construction of Coastal Polder


  1. Name of Polder: Year of construction:

  2. BWDB Division:

  3. District: Upazila: Union (s):






  1. Technical Information




1

Size of scheme (ha): _________




2

Type of scheme (FCD/ FCDI):______
















3

Condition of infrastructures:

3a

Embankment:

Total length: _________km

Length of embankment to be raised/ repaired:_____km







Length of Breaching:___km
















3b

Structures (No.):

Regulators:______

Structures need to be repaired or newly constructed







Drainage cum flushing inlets/ sluice:______

Regulators: Old:___ New:__







Inlets:______

Drainage cum flushing inlets/ sluice:

Old:____ New:___










Inlets: Old:___ New:___

3c

Drainage khals:

Total length:

Total length (after improvement):____km

3d

Irrigation canals:

Total length:

Total length (after improvement): ____

3e

Others (irrigation inlet, culvert, bridge etc)) (No.):

Irrigation inlet:

Culvert:


Bridge:

Irrigation inlet (after improvement): ____

Culvert (after improvement):__

Bridge (after improvement):__


4

Drainage congestion:

Present condition:

□ Yes □ No



Post project condition:

□ Yes □ No



5

  1. Major Components of the improvement works:

a. Embankment raising: _________km

b. Repairing emb. breaching:_____ km

c. New embankment: _____ km

c. Repairing Regulators: Repairing ________(no.), New _____ (no.)

d. Drainage cum flushing inlets/ sluice: Repairing ________(no.), New _____ (no.)

e. Inlets: Repairing ________(no.), New _____ (no.)

f. Drainage channel re-excavation: _____ km

g. New drainage channel excavation: _____ km



g. Others:__________


  1. Potential Environmental Impacts

  1. Questions

  1. Yes

  1. No

  1. Degree of Impact

  1. Remarks

  1. High

Medium

  1. Low

  1. Is the sub-project area adjacent to or within any of the following environmentally sensitive areas?



  1.  Protected Area














Wetland














 Mangrove














Estuarine














 Buffer zone of protected areas














B. 2 Will the sub-project cause………




  1. negative effects on rare (vulnerable), threatened or endangered species of flora or fauna or their habitat?














  1. negative effects on designated wetlands?














  1. negative effects on wildlife habitat, populations, corridors or movement?














  1. negative effects on locally important or valued ecosystems or vegetations?














  1. destruction of trees and vegetation














  1. loss of agricultural land and topsoil?














  1. impact on cropping intensity?



















  1. impact on crop production?



















  1. destruction of fish habitat?














  1. obstruction of fish migration and navigation?














  1. obstruction of natural connection between river and wetlands inside project area?














  1. water logging in polder areas?














  1. insufficient drainage leading to salinity intrusion?














  1. negative effects on surface water quality, quantities or flow?














  1. negative effects on groundwater quality, quantity or movement?














  1. increased soil erosion and /or sedimentation?














  1. negative impact on soil stability and compactness?














  1. impacts on sustainability of associated construction waste disposal?














  1. increased noise due to transportation of equipment and construction materials?














  1. increased noise due to day-to-day construction activities?














  1. increased wind-blown dust from material (e.g. fine aggregate) storage areas?














  1. Other effects:___________________________
















  1. Potential Social/institutional Impacts




  1. Questions

  1. Yes

  1. No

  1. Degree of Impact

  1. Remarks

  1. High

Medium

  1. Low

Will the sub-project interventions cause………




  1. negative effects on neighborhood or community characters?














  1. negative effects on local business, institutions or public facilities?














  1. Displacement of people?














  1. chance of land acquisition from the people for the implementation?














  1. loss of existing buildings, property, economic livelihood?














  1. potential social conflict between occupational groups (farmers vs fisheries)?














  1. degradation or disturbance of historical or culturally important sites (mosque, graveyards, monuments etc.)?














  1. blockage of navigation system?














  1. impediments to movements of people and animals?














  1. conflicts in water supply rights and related social conflicts?














  1. health risks to labors involved in activities?














  1. traffic disturbances due to construction material transport and wastes?














  1. Other effects:___________________________

















  1. Cumulative impacts

  1. Questions

  1. Yes

  1. No

  1. Degree of Impact

  1. Remarks

  1. High

Medium

  1. Low

Will the demonstration cause………




  1. Increase flood situation outside the polders?














  1. river bed rise outside polder due to low water flow?














  1. Scarcity of capture fisheries?














  1. loss of natural ecosystem?














  1. Over exploitation of natural resources?














  1. Change of occupation of local people?














  1. Other effects:___________________________














Note: Please add any other screening questions relevant to the sub-project. Also provide additional comments and/or positive impacts in “remarks” column.

Recommendations:

The project is accepted for further study [ ] The project is rejected [ ]

Only IEE required [ ] Both IEE and EIA required [ ]

Other recommendations:


Screening form filled by: ____________________________ Signature:_______________ Date____
Verified by: ____________________________ Signature:________________Date_____________