7.1: Business Plan

Status: register, charitable, NGO/MPO?

Naturecare Fund?
Funders: big funding:

WWF:TMF -



8: Monitoring



Milestones: A target aimed for at which the action can consider to have been successful.

Key events: An event which triggers an emergency action (i.e. some unacceptable event (of a certain threshold) has been exceeded) / or / that a satisfactory level has been achieved (i.e. an unacceptable existing state of affairs has been mitigated to an acceptable level) so that emergency action is no longer required

Threshholds: a level which when exceeded generates an emergency response of some sort.

If you can tighten these up and check that they are used below properly, I should be most greatful.>



Monitoring

Action

Agency

Frequency

Milestones

Key events

Thresholds

Number of toad and toadlet deaths per night per running kilometer for each known breeding site

1.1 Identify blackspots;

1.3 Toad barriers and channels at blackspots;

1.4 Speed restrictions and temporary calming measures during migration – major roads;

1.6 Traffic calming measures minor roads;

7.2 Modify barrier curbstones and pavements in identified areas


Coordination:

SANParks; NGOs



Action: Volunteers

Collation: SANBI

Summarizing: SANBI

Annually

All breeding sites have mortality below 5% of breeding population;

All known breeding sites monitored;

Reports on website within 2 weeks of migration;


2008 data to feed into 7.1 and 12.1

5% mortality;

2 weeks collation



Number of breeding sites with mortality data

1.1 Identify blackspots;

Summarizing: SANBI

Annually

All breeding sites monitored

No breeding sites not monitored;

100% monitored

Number of blackspots exceeding mortality threshold

1.3 Toad barriers and channels at blackspots;

1.4 Speed restrictions and temporary calming measures during migration;

1.6 Traffic calming measures – minor roads


Coordination:

SANParks; NGOs



Action: Volunteers

Collation: SANBI

Summarizing: SANBI

Annually

No “blackspots” exceed threshold;

0 achieved by 2014



Mortality rates lower at mitigated breeding sites than unmitigated sites: if not >> review effectiveness

5% Mortality of breeding population;

2 weeks collation



Numbers of toads moved

1.4 Speed restrictions and temporary calming measures during migration;

1.6 Traffic calming measures – minor roads;



Coordination:

SANParks; NGOs



Action: Volunteers

Collation: SANBI

Summarizing: SANBI

Annually

No toads needed moving

Number of toads assisted increasing or decreasing significantly; Reports on website within 2 weeks of migration

10% drop in toads moved;

2 weeks collation



Toadlet mortality incurred

2.1 Suitable dredging techniques are deployed

Coordination:

CoCT:BMB



Action: Volunteers

Collation: SANBI

Summarizing: SANBI

Ad hoc following clearing

No toadlet mortality noted due to wetland damage

Monitoring triggered by non-compliance;

Proportion of population likely to have been killed



More than 5% of toadlet population destroyed by inappropriate management

Number of blackspots manned

1.7 Public Awareness and participation

Summarizing: SANBI

Annually

All breeding sites monitored

No breeding sites not monitored

100% monitored

Number of blackspots with Coordinator

1.7 Public Awareness and participation

Summarizing: SANBI

Annually

All breeding sites with coordinator

No breeding sites with coordinator

100% with coordinator

Number of volunteers active

1.4 Speed restrictions and temporary calming measures during migration;

1.6 Traffic calming measures – minor roads;

1.7 Public Awareness and participation


Coordination:

SANParks; NGOs



Action: Volunteers

Collation: SANBI

Summarizing: SANBI

Annually

“Adequate” volunteers present at all breeding sites

Number of volunteers at a breeding site below threshold;

Volunteers inadequate >> request assistance



Minimum of 5 volunteers per breeding site

Number of metro police involved in programme

1.4 Speed restrictions and temporary calming measures during migration;

1.6 Traffic calming measures – minor roads



Coordination:

SANParks; NGOs



Action: Volunteers

Collation: SANBI

Summarizing: SANBI

Annually

Metro police active at all major breeding sites

Metro police not active

Metro police active at top 5 most affected sites

Guidelines and MoU between departments regarding structures and public participation

1.2 Meeting of conservation departments with roads and parks departments of city and province to determine common ground

Coordination:

CoCT:BMB


Action: CoCT:BMB

Summarizing:

CoCT:BMB


Once off MoU,

To be reviewed every 5 years or when appropriate



MoU signed;

Cooperation between departments satisfactory



Compliance breach requiring additional meetings and revisiting MoU and checks and balances

Any breach or apparent breach of compliance within MoU;

An action plan to make blackspots safe for toads in terms of Traffic

1.2 Meeting of conservation departments with roads and parks departments of city and province to determine common ground

Coordination:

CoCT:BMB


Action: CoCT: roads and stormwater

Summarizing:

CoCT:BMB


One off

Action plan completed

Action plan initiated

Deadlines for actions exceeded

An action plan to make blackspots safe for toads in terms of Mowing

1.2 Meeting of conservation departments with roads and parks departments of city and province to determine common ground

Coordination:

CoCT:BMB


Action: CoCT: parks and forests

Summarizing:

CoCT:BMB


One off

Action plan completed

Action plan initiated

Deadlines for actions exceeded

An action plan to make blackspots safe for toads in terms of Waterway management;

1.2 Meeting of conservation departments with roads and parks departments of city and province to determine common ground

Coordination:

CoCT:BMB


Action: CoCT: roads and stormwater

Summarizing:

CoCT:BMB


One off

Action plan completed

Action plan initiated

Deadlines for actions exceeded

MoU between CoCT and road authorities regarding temporary signage

1.5 Temporary Signage: legislation requirements and obtaining approval and guidelines on what is allowed and who can give authority to implement

Coordination:

CoCT:BMB


Action: CoCT: roads

Summarizing:

CoCT:BMB


Compliance: Volunteers

One off MoU;

Annual updating of contact details



Clear guidelines and procedures available;

Identified authorities with contact details;

to be posted on website


Contact details up to date

Problems experienced with signage and officials

Environmental officer on site

2.1 Suitable dredging techniques are deployed

Coordination:

CoCT:BMB



Action: Volunteers

Summarizing: CoCT:BMB

Annually

No transgressions or complaints.

Any transgressions

Officer not on site during any activities during July to December.

Reed growth

2.1 Suitable dredging techniques are deployed

Coordination and Summarizing:

CoCT: Parks and forests



Ad hoc as is required

Open water closed up;

Reeds too dense to monitor toad breeding or toadlet populations

?

Number of inappropriate clearings;

2.1 Suitable dredging techniques are deployed ;

2.2 Suitable timing: No dredging of any Breeding site from July to December;



Action: Volunteers

Summarizing:

CoCT:BMB


Compliance: CoCT:BMB

Annually

No transgressions

Any transgressions

No transgressions

Complaints of waterway unkemptness;

2.2 Suitable timing: No dredging of any Breeding site from July to December;

Summarizing:

CoCT:roads and stormwater



Compliance: CoCT:BMB

Annually

No complaints

Complaints get to point were Stormwater manager upset or demands action >> consider signage

?

Proportion of waterways that are biofriendly

2.3 New and restructured waterways to be biocompliant:

Summarizing:

CoCT:BMB



Annually

All waterways biofriendly

Any new or upgraded waterway to be reassessed

Steep banks to be less than 50% of edge and suitable fringing vegetation present

Dedicated Researcher(s) at SANBI

13. Research at SANBI

Summarizing:

SANBI: TSP



Annually

All research issues resolved

At least 1 researcher until research programme ends

?

Proportion of new developments that are biofriendly

4.1 Ensuring new developments do not impede toad movements

Coordination:

CoCT:BMB


Action:

CoCT: EMS



Summarizing:

CoCT:BMB


Annually

All new developments required to be toad-friendly

Toad-friendly features a requirement of all building plans

?

Proportion of walls that are toad friendly

4.2 Reconfiguring existing walls by either opting for a palisade-type fence or toad holes at 20m intervals

Coordination:

CoCT:BMB


Action: Volunteers

Summarizing:

CoCT:BMB


Annual, for 10 years, then 5-yearly intervals

80% toad friendly within 1km of breeding sites of toads

50% toad friendly within 1km of breeding sites of toads

50% toad friendly within 1km of breeding sites of toads

Gardens with toads

4.2 Reconfiguring existing walls by either opting for a palisade-type fence or installing toad holes at 20m intervals

Coordination:

CoCT:BMB


Action: Volunteers

Summarizing:

CoCT:BMB


Annual, for 10 years, then 5-yearly intervals

80% of gardens within 1km of breeding sites of toads

50% of gardens within 1km of breeding sites with toads

50% of gardens within 1km of breeding sites with toads

Dates of mowing

5.1 Timing: no mowing within a week of any migration within 1km radius of Breeding sites

Coordination:

CoCT:BMB


Action: Contractors and CoCT: Parks and Forestry

Summarizing:

CoCT:BMB


Annually

No transgressions for a season

Any transgression to be followed up with site visit and review of MoU and contractors contracts

No transgressions should occur

Opportunistic monitoring by volunteers

5.1 Severity of mowing: mowing during the breeding season and until the high fire season should be at least 100mm above ground level

Coordination:

CoCT:BMB


Action: Contractors and CoCT: Parks and Forestry

Summarizing:

CoCT:BMB


Annually

No transgressions for a season

Any transgression to be followed up with site visit and review of MoU and contractors contracts

No transgressions should occur

Running km of stormwater system that is toad compliant within foraging areas.

6.1 All stormwater lines within foraging areas should have a toad escape route at least every 200m.

Coordination:

CoCT:BMB


Action:

CoCT: Roads and Stormwater



Summarizing:

CoCT:BMB


Annually initially for 10 years, then every 5 years

80% of stormwater running km are toad complaint

MoU signed;

50% of stormwater running km are toad complaint



?

Number of breeding sites with curbstone problems

7.1 Identify curbstones and barriers within 1km radius blackspots and breeding sites that impede movement;

7.2 Modify barrier curbstones and pavements in identified areas



Coordination:

CoCT:BMB


Action:

Volunteers



Summarizing:

CoCT:BMB


Annually for 10 years and then 5-year intervals

All breeding sites with barriers refurbished to be toad friendly

< >




Number and extent of sewage outfalls

9.1 Restrict and contain sewage outfalls

Coordination:

CoCT:BMB


Action:

CoCT: Roads and Stormwater



Summarizing:

CoCT:BMB


Annually

No outfalls in Breeding areas for a season







Tons of rubbish removed from wetlands;

9.2 Prevent and remove refuse pollution and dumping in wetlands and canals

Coordination:

CoCT:BMB


Action:

CoCT: Roads and Stormwater



Summarizing:

CoCT:BMB


Annually

All Breeding areas clear of rubble







Number of incidents of dumping in wetlands reported

9.2 Prevent and remove refuse pollution and dumping in wetlands and canals

Coordination:

CoCT:BMB


Action:

CoCT: Roads and Stormwater



Summarizing:

CoCT:BMB


Annually

No dumping in Breeding areas for a season







Number of convictions for dumping in wetlands

9.2 Prevent and remove refuse pollution and dumping in wetlands and canals

Coordination:

CoCT:BMB


Action:

CoCT: Roads and Stormwater



Summarizing:

CoCT:BMB


Annually

All incidents of dumping in Breeding areas for a season are prosecuted







Breeding sites that exceed city standards for pollution and toxic materials

9.3 Monitor water quality for major pollutants, heavy metals and poisons

Coordination:

CoCT:BMB


Action:

CoCT: Roads and Stormwater

CoCT: Scientific Services

Summarizing:

CoCT:BMB


Annually

No exceedences of pollution or toxic materials







Pools with toad ladders;


10.1 Create an awareness of the hazard of pools to toads and animals and the simple and elegant solution

Coordination & summary:

CoCT:BMB


Action:

Volunteers



Every 5 years

50% of swimming pools with toad ladders







Number of toad ladders on the market

10.1 Create an awareness of the hazard of pools to toads and animals and the simple and elegant solution

Coordination & summary:

CoCT:BMB


Action:

Volunteers



Every 5 years

Toad ladders in all major stores and pool maintenance shops







Pamphlets submitted;


11.1 Increased awareness among homeowners

Coordination & summary:

CoCT:BMB


Action:

Volunteers



Annually

All houses dropped within 2km of breeding sites.







Volunteer numbers;


11.1 Increased awareness among homeowners

Coordination & summary:

CoCT:BMB


Action:

Volunteers



Annually

At least 5 people per night per breeding site during the breeding period







Participants in Annual School competition

11.2 Annual School competition1 and Toad Day: 1st August

Coordination & summary:

CoCT:BMB


Action:

Volunteers



Annually

Each school within 2km of breeding sites to participate







Number of gardens with Toad-friendly status;

11.3 Initiate a Toad-friendly status2 and competition

Coordination & summary:

CoCT:BMB


Action:

Volunteers



Annually

50% of gardens within 2km of breeding sites







Proportion of electrical fences toad compliant at each Breeding site

12.1 Survey electric fences within 1km of Breeding sites or blackspots;

12.2 Electric fences to be at least 100mm above ground



Coordination & summary:

CoCT:BMB


Action:

Volunteers



One off, then every 5 years

90% of electrical fences within 2km of breeding sites







Estimated populations of alien fish at each breeding site;


8.1 Survey the distribution and abundance of alien fish at breeding sites

Coordination & summary:

CoCT:BMB


Action:

CapeNature



One off, then every 5 years, but annually at infested sites

No breeding areas with alien fish present

All breeding sites with low levels of alien fish




Number of breeding sites surveyed for alien fish

8.1 Survey the distribution and abundance of alien fish at breeding sites

Coordination & summary:

CoCT:BMB


Action:

CapeNature



Annually

All breeding sites surveyed every 5 years, all sites with high populations surveyed annually

Annual surveys of high population fish at breeding sites deemed unnecessary




Breeding sites with alien fish at unacceptably high population levels

8.2 Remove alien fish by catching and selective poisoning (if appropriate)

Coordination & summary:

CoCT:BMB


Action:

CapeNature



One off, then every 5 years, but annually at infested sites

No breeding areas with high populations of alien fish present

All significant breeding sites with low levels of alien fish




New development applications

include condition requiring an OEMP, of which monitoring will be a part of.






DEA&DP:IEM

CoCT: EMS

































1   2   3   4   5   6   7


Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©atelim.com 2016
rəhbərliyinə müraciət