A3.7 – Incremental cost of backup power for electric barrier – S3.5

Proposed standard S3.5 specifies that an operator must ensure that an electric barrier has a backup power source if it is the primary containment barrier for an enclosure. The one-off incremental cost of this proposed standard is estimated with the following assumptions:




  • One-off cost of installing a generator (diesel) estimated cost at $1,259.95141; and

  • 5% of medium and small facilities not having backup power;

As shown in Table A3.12, the estimated one-off cost of backup power under proposed standard S3.5 would be $12,788 and would essentially entail one to two additional backup generators required for medium size facilities and about eight to nine additional backup generators required for small size facilities.


Table A3.12: Estimated one-off cost of backup power under proposed standard S3.5


Jurisdiction

Cost to medium facilities

(m2) = (d)142*5%*$1259.95

Cost to small facilities

(n2) = (e)143*5%*$1259.95

Total cost to all facilities

(o2) = (m2)+(n2)

NSW

$504

$3,087

$3,591

VIC

$363

$2,220

$2,583

QLD

$389

$2,383

$2,772

SA

$44

$271

$315

WA

$345

$2,112

$2,457

TAS

$97

$596

$693

NT

$44

$271

$315

ACT

$9

$54

$63

Total one-off cost (Australia)

$1,795

$10,994

$12,788

As shown in Table A3.13, the estimated one-off cost of backup power under proposed standard S3.5 over 10 years would be $11,952 in present value 2012-13 dollars with 85.96% of the cost incurred by medium size facilities.



Table A3.13: Estimated one-off cost of backup power under proposed standard S3.5 by state and territory and size of facility over 10 years – 2012-13 dollars


Jurisdiction

Medium Facilities

Small Facilities

Total Facilities

NSW

$471

$2,885

$3,356

VIC

$339

$2,075

$2,414

QLD

$364

$2,227

$2,591

SA

$41

$253

$294

WA

$322

$1,974

$2,296

TAS

$91

$557

$648

NT

$41

$253

$294

ACT

$8

$51

$59

Total one-off cost (Australia) PV - 7% discount

$1,677

$10,274

$11,952

% share of one-off cost

14.04%

85.96%

100.00%

One-off cost PV - 3% discount sensitivity

$1,743

$10,673

$12,416

One-off cost PV - 10% discount sensitivity

$1,632

$9,994

$11,626