Title: Safe Work Procedure Template No. Dee eswb-05-2-2


Yüklə 152.5 Kb.
tarix24.06.2016
ölçüsü152.5 Kb.

powerpluswatermarkobject3

Title: Safe Work Procedure Template

No. DEE ESWB-05-2-2

Authorised By: Manager ESWB



CENTRAL OFFICE USE ONLY
Issue Date: July 2010

Last Reviewed: January 2015

Next Review Date: May 2015

Page Number: of




DO NOT use this machine unless you have been trained in its safe use and operation.

Description of Work:

Using a Scissor Lift

INCLUDEPICTURE "http://www.gtindu.com/pages/products/images for web/electric-scissor-lift-52545.jpg" \* MERGEFORMATINET INCLUDEPICTURE "http://www.gtindu.com/pages/products/images for web/electric-scissor-lift-52545.jpg" \* MERGEFORMATINET

Potential Hazards:

Exposure to moving parts with the potential to cause harm through entanglement, impact and cutting, shearing, electricity, ergonomics, and slips, trips and falls.



Personal Protective Equipment (PPE) Required (Check the box for required PPE):


Gloves


Face Masks

Eye

Protection


Welding Mask


Appropriate

Footwear


Hearing Protection


Protective Clothing















Safe Work Procedure Checklist:

1. PRE-Operation:

  • Ensure operator is licensed to Perform High Risk Work – Working at Heights.

  • Perform Pre Start Check of all components and platform.

  • Report any faults to your supervisor. Do not operate lift if any faults are found and isolate scissor lift by using a Lock Out Tag Out system.

  • Ensure the area of operation is clear of debris and is stable and even.

  • Ensure all tools and materials are secured to the platform.

  • Temporarily fence off the area surrounding the lift to ensure that no one can enter the area during operation.

  • Ensure that harnesses are used and attached to appropriate anchor points.

2. Operation:

  • Always move the lift in the lowered position to enable the operator to have a clear line of sight.

  • Do not lean out over rails of platform when working at heights.

  • Ensure the lift is rated to take the weight of the load including tools and the persons using the platform.

  • Ensure the load weight is evenly distributed on the platform.

  • Place sign on bottom control panel to prevent unauthorised movement or operation of machine while in use.

  • If fitted, depress ‘Dead Man’ button to prevent movement of machine.

3. POST-Operation:

  • Lower the lift.

  • Detach from anchor points.

  • Store in a suitable position.

  • Remove power cord from outlet.

Competent Persons (The following persons are authorised to operate, supervise and test students on the equipment/process).

Name:

Title:

Contact Details: